Prediction of cutting tool wear in long and complex strata based on field inspection geometry: Insights from a case study of twin earth pressure balance shield tunnelling | Synapse
March 3, 2026
Prediction of cutting tool wear in long and complex strata based on field inspection geometry: Insights from a case study of twin earth pressure balance shield tunnelling
Key Points
Cutting tool wear increases in complex strata during tunnelling, impacting project efficiency and costs.
Key evidence includes tool wear rates measured in twin earth pressure balance shield tunnelling operations.
Analysis of field inspection geometry enhances prediction capabilities, making it essential for effective planning.
These insights aim to optimize tunnelling strategies, though further validation in varied conditions is necessary.