An e^+e^- collider, christened DAFNE (Double Anular F factory for Nice Experiments), optimized for operation at a total energy of 1020 MeV, is under construction at the Frascati National Laboratories (LNF) of the National Institute of Nuclear Physics (INFN). The new machine will be placed into the extisting buildings which in the past housed the Linac-Adone complex, which definitively ceased operation April 26th 1993 and was at once decomissioned. The Linac-Adone complex has operated without stopping up to the 26th of April 1993 except for the ordinary maintenance periods. It was composed by a Linac, capable of accelerating 100mA of e- beam peak current to 400MeV and 1mA of e^+ peak current to 365 MeV, in operation since 1964, and by an e^+e^- storage ring capable of storing 2x1011 particles per beam at 1500 MeV, in opearation since 1967.