Key points are not available for this paper at this time.
Summary This paper provides guidelines to assess the productivity of horizontal-well completions by drilling multiple drainholes or by stimulation with vertical fractures. The paper also offers reliable methods to compute productivity gains for realistic conditions.
Raghavan et al. (Mon,) studied this question.