A 100-study pre-registered Modal cloud A100 stress test of the spiral-domain H-pipeline (studies 1741–1840, fifteen sub-campaigns α through ο, 70. 0 percent SUPPORTED). Three Outcome A reframing findings: (θ) 5-class clinical macro-AUC 0. 657 beats Chronos 0. 642 at 511× lower bandwidth; (μ) drift / out-of-source detection AUC = 1. 000 at 30-microsecond latency; (ξ) host-CPU streaming p99 = 0. 385 ms matches Modal A100 p99 = 0. 389 ms, refuting the "GPU required" objection to edge deployment. Foundation-model field rank extends Paper 16's Chronos-only baseline: H-pipeline = 1 BPE, Moirai = 511. 46, MOMENT = 511. 94, TimesFM = 512, Chronos = 900, naive cl100kbase = 1024. Six honest Outcome C disclosures preserve pre-registration discipline. Companion deposits in this Zenodo Community (spiral-domain-encoder-campaign): · Paper 8 — 10. 5281/zenodo. 20466035 · Paper 9 — 10. 5281/zenodo. 20470763 · Paper 10 — 10. 5281/zenodo. 20480183 · Paper 11 — 10. 5281/zenodo. 20495976 · Paper 12 — 10. 5281/zenodo. 20499453 · Paper 13 — 10. 5281/zenodo. 20595834 · Paper 14 v3 — 10. 5281/zenodo. 20596597 · Paper 15 — 10. 5281/zenodo. 20596931 · Paper 16 — 10. 5281/zenodo. 20602959 · Paper 17 — 10. 5281/zenodo. 20634763 (https: //doi. org/10. 5281/zenodo. 20634763) ← this deposit Related U. S. Provisional Patent Applications (all previously filed; no new provisional required for this paper): Parent H (64/080, 096), Parent I (64/084, 807), Parent J (64/084, 817), Parent K (64/084, 821), Parent L (64/084, 827). 12-month non-provisional conversion deadline: 2027-06-11. Licensing inquiries: Randolph James Ferlic, M. D. , randolphf@fieldstoneanalyticsllc. com.
Ferlic et al. (Thu,) studied this question.