Los puntos clave no están disponibles para este artículo en este momento.
This study utilized the Gaussian Processes (GPs) regression framework to establish stochastic error bounds between the actual and predicted state evolution of nonlinear systems. These systems are embedded in the linear parameter-varying (LPV) formulation and controlled using model predictive control (MPC). Our main focus is quantifying the uncertainty of the LPVMPC framework's forward error resulting from scheduling signal estimation mismatch. We compared our stochastic approach with a recent deterministic approach and observed improvements in conservatism and robustness. To validate our analysis and method, we solved the regulator problem of an unbalanced disk.
Karachalios et al. (Wed,) studied this question.