Los puntos clave no están disponibles para este artículo en este momento.
Abstract The L inear I nternational Fusion Materials Irradiation Facility P rototype Ac celerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms — CW D+ at 5 MeV with the high-power beam dump. The 1 st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper.
Kwon et al. (Wed,) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: