Introduction: The features for a hydroelectric-power-generation-forecasting model can vary depending on whether it operates in a regulated or open system. The objective of this research is to implement a methodology for forecasting the power generation of a hydroelectric plant operating in a regulated system with a generation deficit. Features related to plant operation and its electrical environment should be considered.
César A. Yajure-Ramírez (Mon,) studied this question.