Los puntos clave no están disponibles para este artículo en este momento.
Abstract The economic lot scheduling problem (ELSP) has received much attention recently. The general version of the problem has a non-convex objective function, so it is difficult to find truly optimal solutions. We examine the three most popular heuristic approaches to the fixed-sequence ELSP. Each approach imposes one or both of these simplifying constraints: the zero-switch constraint (production of a part is started only when its inventory is depleted) and the equal-lot constraint (the lot size of a given part is constant through time). We provide a formulation that clarifies the relationships between the general problem and the three constrained versions, and compare their performances in a computational study.
Bourland et al. (Sat,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: