Longtown Castle, Remedial Drainage Works, Archaeological Watching Brief

View Full Paper
PRPhilip RobertsHeadland Archaeology (UK) Limited (United Kingdom)CSChris SearHeadland Archaeology (UK) Limited (United Kingdom)

Key Points

  • The aim was to conduct remedial drainage works while ensuring archaeological integrity of the site.
  • Excavated four test pits to locate and repair a blocked drain.
  • Regraded an existing drainage ditch and constructed a new headwall.
  • Replaced a broken drainage pipe and uncovered a buried manhole.
  • Identified and repaired damaged drainage without uncovering archaeological remains.
  • New drainage features including a headwall and kerbing were installed.
  • All monitoring was conducted by a qualified archaeologist to preserve site integrity.

Abstract

The remedial works comprised the following; a) An existing drainage ditch to the north-east of the embankment was regraded and a new headwall constructed above the outfall pipe. Maximum depth of regrade of the order of 300mm. b) There was a broken drainage pipe under the verge near the old well between the carriageway (Llanwonog Lane) and the drainage ditch. This section of pipe was dug up and replaced. c) A buried manhole was identified at the road junction outside of Castle Cottage. This was uncovered and replaced with a new cover and made level with the carriageway. d) New kerbing and a concrete apron was installed around the gully outside Castle Cottage. Note c) and d) are outside the area of the scheduled monument. The excavations were carried out by a 10tn mechanical excavator with a toothless bucket and all monitoring was carried out by a suitably qualified archaeologist. After the excavation of Test Pits 1 and 3, which located the damaged drainage pipe, they were joined to enable the laying of new pipe. This new pipe trench was recorded as Test Pit 4. A total of four test pits were excavated to identify a blocked drain and affect a repair. The archaeological monitoring identified a sequence of topsoil, subsoil and natural deposits. No archaeological remains were uncovered.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Roberts et al. (2022) studied this question.

synapsesocial.com/papers/69f6e5618071d4f1bdfc6182https://doi.org/10.5284/1141688
Ask AI
Helpful
Bookmark
Share
View Full Paper