November 21, 2002Journal of Construction Engineering and Management111 citations

Constraint Programming Approach to Precast Production Scheduling

View Full Paper
WCWeng Tat ChanHHHao Hu

Key Points

Key points are not available for this paper at this time.

Abstract

Current scheduling practices in precast plants are fairly basic and depend greatly on experience. This may lead to inefficient resource utilization, over-inventory, and/or missing delivery dates. Computer assisted scheduling may therefore be useful in producing better production schedules. This paper shows how constraint programming (CP) can be applied in production scheduling for precast plants. The paper describes a constrained precast scheduling model that incorporates the key constraints and objectives considered by production schedulers. A capacity-based backward-scheduling earliest due date rule and a CP approach are developed to solve the model. The CP approach is computationally efficient, even though it incorporates many problem-derived constraints. The efficiency of the CP approach lies in the fact that the representation (model) is separated from the algorithm (solver). Strategies to improve the performance of the CP approach are identified, and the CP approach is compared against commonly used heuristic rules on an example problem.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Chan et al. (2002) studied this question.

synapsesocial.com/papers/6a1d91315b7fddc352057352https://doi.org/10.1061/(asce)0733-9364(2002)128:6(513)
Ask AI
Helpful
Bookmark
Share
View Full Paper