PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
August 15, 2025Processes0 citationsOpen Access

Temporal–Spatial Acceleration Framework for Full-Year Operational Simulation of Power Systems with High Renewable Penetration

View Full Paper
CWChen WangZLZhiqiang LuCZCuntai Zhang

Key Points

  • This framework reduces computational burden for full-year operational simulations of power systems with high renewable penetration.
  • Using K-means clustering, the proposed method preserves typical scenario days and seasonal variability while managing uncertainty.
  • The model transforms complex mixed-integer linear programming into a more tractable linear programming format, enhancing efficiency.
  • Case studies on the six-bus and IEEE RTS-79 power systems demonstrate practical applications for planning and dispatch.

Abstract

With the rapid growth of renewable energy integration, power systems are facing increasing uncertainty and variability in operation. The intermittent and uncontrollable nature of wind and solar generation requires operational decisions to anticipate future fluctuations, creating strong temporal coupling across days. This leads to large-scale mixed-integer linear programming (MILP) with a large number of binary variables, which is computationally intensive—especially in year-long simulations. As a result, there is a growing need for efficient modeling approaches that can reduce complexity while preserving key temporal features. This paper proposes a temporal–spatial acceleration framework for long-term power system operation simulation. In the temporal dimension, a monthly K-means clustering algorithm is applied to reconstruct typical scenario days from 8760 h time series, preserving the characteristics of seasonal and intraday variability. In the spatial dimension, thermal units with similar characteristics are aggregated, and binary decision variables are relaxed into continuous variables, transforming the MILP into a tractable LP model, and thereby reducing computational burden. Case studies are performed based on the six-bus and the IEEE RTS-79 systems to validate the framework, being able to provide a practical solution for renewable-integrated power system planning and dispatch applications.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Wang et al. (2025) studied this question.

synapsesocial.com/papers/68a3656a0a429f797332b887https://doi.org/10.3390/pr13082502
Ask AI
Helpful
Bookmark
Share
View Full Paper