PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
October 16, 2025Buildings0 citationsOpen Access

A Novel Prediction Model for Estimating Ground Settlement Above the Existing Tunnel Caused by Undercrossing

View Full Paper
LWLinfeng WangXLXinrong LiuXZXiaohan Zhou

Key Points

  • The prediction model estimates ground settlement due to a new tunnel undercrossing an existing tunnel, achieving high consistency in results.
  • Results indicate a maximum settlement of 0.765 mm within 50 m of the new tunnel's axis, suggesting significant impacts on surface conditions.
  • A new consistency assessment method was developed to evaluate the prediction model's accuracy against numerical simulations.
  • Larger existing tunnel diameters were linked to reduced settlement in proximate areas, demonstrating the influence of tunnel dimensions.

Abstract

A new tunnel undercrossing an existing tunnel not only affects the deformation and stress response of the existing tunnel but also triggers ground settlement due to secondary excavation disturbances. By combining the equivalent layer method with the mirror method and incorporating corrections from numerical simulations based on actual intersection projects, a novel prediction model is developed to consider the impact of the existing tunnel on estimating ground settlement caused by a new tunnel that undercrosses it in an orthogonal manner. The influence of geological conditions, tunnel dimensions, and spatial layout on ground settlement patterns was investigated. The elastic moduli of smaller strata correlate with greater surface settlement. Larger existing tunnel diameters result in reduced settlement within a 15 m area near the new tunnel axis. Conversely, new larger tunnel diameters yield more pronounced settlement. A consistency assessment method was introduced to quantitatively measure the consistency between the prediction model and numerical simulations. The results indicate that the prediction model exhibits high consistency (CI > 0.9) under various conditions. Based on an actual engineering case, indoor similarity model tests were designed. When the new tunnel is directly located beneath the existing tunnel, ground settlement begins, with a maximum settlement of 0.17 mm. After the new tunnel traversed the existing one, ground settlement continued to increase within approximately 50 m on both sides of the new tunnel’s axis, ultimately reaching a value of about 0.765 mm. The CI between the predictive model and the model test results reached 0.8, confirming the model’s robust predictive capability.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Wang et al. (2025) studied this question.

synapsesocial.com/papers/68f10ecee6a12fd0428999fdhttps://doi.org/10.3390/buildings15203708
Ask AI
Helpful
Bookmark
Share
View Full Paper