Metallurgical-grade silicon (MG-Si) is an important source material for many industrial applications, including the manufacture of alloys, solar photovoltaics, and electronics. The process to refine raw materials into MG-Si is energy-intensive, with the predominant method of submerged-arc furnaces requiring energy consumption of approximately 11–13 kWh/kg Si. Recent research has discussed promising methods for reducing the energy required for the silicon production process, including the use of molten-salt electrolysis (MSE), a technique that offers potential savings in energy consumption without requiring carbon inputs for the process. This paper presents a techno-economic study of a potential industrial-scale MSE plant for MG-Si production to evaluate the trade-offs between capital and operating costs of the system. Capital costs are sourced from recent MG-Si plants and an existing cost model developed for MSE processes that includes the size of the plant and the operating temperature among its inputs. The results show that MSE technology has the potential to be an economically cost-competitive option for MG-Si production if the technology successfully scales to industrial production and matures enough to allow for financing costs similar to that of a comparably sized submerged-arc furnace plant.
Zolan et al. (Wed,) studied this question.