March 1, 1954Naval Research Logistics Quarterly3,260 citations

Optimal two‐ and three‐stage production schedules with setup times included

View Full Paper
SJS. M. Johnson

Key Points

Key points are not available for this paper at this time.

Abstract

Abstract Each of a collection of items are to be produced on two machines (or stages). Each machine can handle only one item at a time and each item must be processed through machine one and then through machine two. The setup time plus work time for each item for each machine is known. A simple decision rule is obtained in this paper for the optimal scheduling of the production so that the total elapsed time is a minimum. A three‐machine problem is also discussed and solved for a restricted case.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

S. M. Johnson (1954) studied this question.

synapsesocial.com/papers/6a179cd24f2b3115b012c9d4https://doi.org/10.1002/nav.3800010110
Ask AI
Helpful
Bookmark
Share
View Full Paper