Key points are not available for this paper at this time.
Utility experience to date with photovoltaic systems has been with small dispersed systems designed primarily as demonstration projects. The 1 MW photovoltaic plant at Lugo Substation in Hesperia, California, has been designed and is operated as a central station power plant. The performance of the system has been monitored since first coming on line in November 1982. The potential impact of this and similar systems upon the operation of the utility is discussed.
Patapoff et al. (1985) studied this question.