Key points are not available for this paper at this time.
Instrumentation of jobs throughout its life-cycle is not obvious, as they are quite independent after being submitted, crossing multiple environments and locations until landing on a worker node. In order to measure correctly the resources used at each step, and to compare it with the view from a Fabric Infrastructure, a solution is proposed using Messaging System for the Grids (MSG) for integrating information coming from different sources.
Casey et al. (Thu,) studied this question.