Key points are not available for this paper at this time.
A procedure is presented for the determination of spinning reserve requirements such that the reliability of service remains constant from hour to hour, day to day, and season to season. The effect of such factors as changes in load level, changes in short-time load forecasting error probabilities and changes in the size of units scheduled to operate are taken into account. The procedure described has been adopted by the Pennsylvania-New Jersey-Maryland Interconnection.
Building similarity graph...
Analyzing shared references across papers
Loading...
L. T. Anstine
R. E. Burke
University College Dublin
John E. Casey
Teagasc - The Irish Agriculture and Food Development Authority
IEEE Transactions on Power Apparatus and Systems
University of Baltimore
Philadelphia Fire Department
Public Service Electric and Gas (United States)
Building similarity graph...
Analyzing shared references across papers
Loading...
Anstine et al. (Tue,) studied this question.
synapsesocial.com/papers/6a12f5b113ab6312a8c0c59b — DOI: https://doi.org/10.1109/tpas.1963.291390