Key points are not available for this paper at this time.
Smart factories Industry 4.0 on the basis of collaborative cyber-physical systems represents a future form of industrial networks. Supply chains in such networks have dynamic structures which evolve over time. In these settings, short-term supply chain scheduling in smart factories Industry 4.0 is challenged by temporal machine structures, different processing speed at parallel machines and dynamic job arrivals. In this study, for the first time, a dynamic model and algorithm for short-term supply chain scheduling in smart factories Industry 4.0 is presented. The peculiarity of the considered problem is the simultaneous consideration of both machine structure selection and job assignments. The scheduling approach is based on a dynamic non-stationary interpretation of the execution of the jobs and a temporal decomposition of the scheduling problem. The algorithmic realisation is based on a modified form of the continuous maximum principle blended with mathematical optimisation. A detailed theoretical analysis of the temporal decomposition and computational complexity is performed. The optimality conditions as well as the structural properties of the model and the algorithm are investigated. Advantages and limitations of the proposed approach are discussed.
Building similarity graph...
Analyzing shared references across papers
Loading...
Dmitry Ivanov
Alexandre Dolgui
Boris Sokolov
International Journal of Production Research
Centre National de la Recherche Scientifique
Otto-von-Guericke University Magdeburg
Chemnitz University of Technology
Building similarity graph...
Analyzing shared references across papers
Loading...
Ivanov et al. (Mon,) studied this question.
www.synapsesocial.com/papers/6a09d4f187ad1657d251bd55 — DOI: https://doi.org/10.1080/00207543.2014.999958