Not only ETO (Engineering to Order), but even serial production industry should know how to deal with projects and their schedule: plant commissioning, shutdown, introducing new products and similar circumstances should be managed with adequate planning and resource allocation techniques to create a schedule useful in decision making during the execution. The current complex reality, with evolving technologies and fierce pressure to reach the market as soon as possible, pushes the project managers to use more advanced techniques than waterfall planning, such as agile or lean. It also requires them to take a holistic view and manage concurrent tasks in complex projects. The contributions of this paper are two: the proposal to control specific parallel groups of waterfall activities under uncertain environments, which can lead to iterations and reworks, as a single concurrent Activity Managed by Kanban Methods (AMKM). This activity can be subsequently embedded into traditional scheduling approaches as CPM-PERT. The second contribution is the feasibility of its application in industrial environments due to the affordability of simulation software. Two use cases are shown as evidence. It is not a disruptive proposal, but a kaizen action based on very mature technologies. Finally, it is suggested some improvements to be implemented in Project Management Software due to this ‘kaizen’ proposal.
Fidalgo et al. (Fri,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: