Key points are not available for this paper at this time.
Purpose This paper reviews the current literature on the major challenges faced by building contractors in the UK due to COVID-19 to create an evaluation framework. Design/methodology/approach A PRISMA scoping review systematically maps the information published and establishes the potential challenges, as a precursor to a literature review that synthesises the data available to establish an initial COVID-19 evaluation framework to build a rationale for a future series of studies. Findings The research identified these seven challenges: health and safety on-site, economic cost, possible legal exposures, manpower availability, instability of the supply chain and subcontractors, and the uncertainty related to the constant and unpredictable evolution of the pandemic. The magnitude of each challenge was also found to differ depending on the size of the contractor, the rigor of local regulations and the sector where the contractor works. Research limitations/implications This research contributes to increasing understanding on the subject and provides an initial assessment framework, based on these seven parameters, so that contractors can analyse their weaknesses and plan specific priorities so that their companies can remain competitive, minimising the impact of COVID-19 and possible future waves. Originality/value This research is timely and relevant as it produces the first academic review on how COVID-19 has affected contractors and the construction stage. This document gives a holistic view of the new scenario created by COVID-19 and creates a self-assessment system for contractors to test their resistance to COVID-19.
Francisco Sierra (Thu,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: