Key points are not available for this paper at this time.
A flow shop problem exists when all the jobs have the same processing order through the machines. In flow shop problem, the technological demand that the jobs pass between the machines in the same order. The objective of this paper is to find an optimal ordering of 'n' jobs for three machines involving processing times, transportation times, break down interval and weights of the jobs by using genetic algorithm (GA) approach. The proposed algorithm is compared with already published problems in literature. The numerical results show that the present algorithm is a good one within the best well known heuristic algorithms in the field.
Building similarity graph...
Analyzing shared references across papers
Loading...
Harendra Kumar
Pankaj Kumar
Manisha Sharma
International Journal of Operational Research
Panjab University
Gurukul Kangri Vishwavidyalaya
Building similarity graph...
Analyzing shared references across papers
Loading...
Kumar et al. (Tue,) studied this question.
www.synapsesocial.com/papers/69f1bf13ba0eb63c1ddd3322 — DOI: https://doi.org/10.1504/ijor.2019.101456