Key points are not available for this paper at this time.
With the rapid increase of inverter-based resources in modern grids, advanced grid-forming (GFM) inverter capabilities, such as system restoration and operation under faults, are urgently needed to realize power electronics-dominant grids at scale. One such capability is inverter-driven black start using GFM inverters. This paper analyzes the ability of two recently proposed advanced GFM controls to help GFM inverters sustain system-wide, off-nominal conditions and remain synchronized until they can overcome the momentary overloading as more GFMs join the process without generator sequence coordination or communications and finally stabilize the grid. Through an extensive set of 1,200 full-order electromagnetic transient simulations, we evaluate the black-start process while employing the various GFM inverter controls. The results show that the GFM current limiter and primary control have a significant impact on the stability of the system during dynamic operating conditions and thus impact the success of inverter-driven system restoration.
Baeckeland et al. (2024) studied this question.