Key points are not available for this paper at this time.
At the BINP, the development, production and launch at JINR of a system for transferring a beam from the Booster to the Nuclotron of the NIKA complex was completed. The article discusses the equipment of monitoring and control subsystems, as well as describes the principles and composition of a software package based on the TANGO platform, designed to perform engineering manipulations with individual elements and suitable for work during acceleration sessions.
Building similarity graph...
Analyzing shared references across papers
Loading...
Shchegolkov et al. (Wed,) studied this question.
www.synapsesocial.com/papers/68e651c6b6db6435875e22ff — DOI: https://doi.org/10.25205/2541-9447-2024-19-1-23-33
N. S. Shchegolkov
A. V. Pavlenko
А. Н. Журавлев
Siberian Journal of Physics
Budker Institute of Nuclear Physics
Building similarity graph...
Analyzing shared references across papers
Loading...