Key points are not available for this paper at this time.
Global environmental issues have become increasingly serious in recent years and have had a major impact on the economy and society.Water-related problems are one of these environmental issues, and e ective utilization of water resources is required.One such measure is the utilization of energy from by-products generated in sewerage projects.It has been proven that the utilization of energy from by-products in sewage systems contributes to substantial reductions in greenhouse gas emissions, but in Japan, the utilization rate is not high.One of the reasons for this is a lack of consideration of the economic aspects of the project and concerns about investment costs.Therefore, in order to increase the utilization rate, it is necessary to verify the economic feasibility of this project, and this study will conduct such veri cation.In order to verify the economic feasibility of this project, the city of Yokohama, which already has several years of experience in this eld, was selected as the target city, and a hypothesis was formulated that the project would be economically useful.Speci cally, it was assumed that energy utilization of by-products would lead to lower energy demand and energy sales, which would contribute to lower running costs.In addition, two sub-hypotheses were developed for speci c veri cation.Sub-hypothesis 1 assumes a large-scale investment type that comprehensively implements everything from sewage treatment to the conversion of by-products into energy.Sub-hypothesis 2 assumes a small-scale investment type in which the fuel and energy conversion portions are outsourced.The veri cation of sub-hypothesis 1 and sub-hypothesis 2 was conducted by simulation and by using the nancial data of Yokohama City, respectively, and it was con rmed that each of them contributes to the reduction of running costs.Based on the above, the hypothesis was judged to be valid.
Chihiro Konasugawa (Tue,) studied this question.