With the vigorous development of prefabricated construction, data management and dynamic monitoring in the assembly process of prefabricated components have become key challenges. This research thoroughly integrates workflow and BIM technologies, innovatively constructing a comprehensive visual monitoring system. By reshaping the business process, establishing a refined data management model, and designing an efficient visual monitoring system, precise control and management of the assembly process of prefabricated components have been achieved. This system has achieved remarkable results in practical engineering applications. Future research will focus on the in-depth integration of Internet of Things technology and intelligent decision-making optimization, promoting the management of prefabricated construction to a higher level of intelligence.
Building similarity graph...
Analyzing shared references across papers
Loading...
Qing Tian
Northwestern Polytechnical University
Shaoxiong Ma
East China Jiaotong University
Hailiang Zhang
Zhejiang University
Advances in Engineering Technology Research
Building similarity graph...
Analyzing shared references across papers
Loading...
Tian et al. (Thu,) studied this question.
synapsesocial.com/papers/68c1a76954b1d3bfb60e03ef — DOI: https://doi.org/10.56028/aetr.14.1.8.2025
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: