The method of implementation of column construction work is an important part in supporting the success of the building structure in the STAN Bintaro Sector 5 Campus Dormitory construction project. The column functions as the main vertical element that transmits loads from the upper structure to the foundation, so it requires proper planning and implementation, efficient, and according to technical standards. This practical work discusses the steps of implementing column work, starting from the preparation of tools and materials, formwork work, assembly and installation of reinforcement, concrete casting, to the curing process. In addition, it also discusses aspects of work safety, quality control, and obstacles that may occur in the field. With the application of structured work methods and strict supervision, it is expected that the quality of K1 column construction can meet the standards of strength, durability, and durability required in this dormitory construction project.
Saputra et al. (Wed,) studied this question.