Shale gas pressure post-production accompanies the entire production process. The depth of the tubing is crucial for the entire life cycle of production, especially influencing the production dynamics in the middle and later stages of downward-inclined Wells. The full dynamic multiphase flow simulation method is adopted, combined with wellbore structure, fluid composition (gas), gas layer temperature and pressure gradient, production dynamic data, etc., to establish the wellbore structure model of the gas well, simulate the production dynamics under different formation pressures and tubing depths, and determine a reasonable tubing depth. Considering the material balance of the constant-volume gas reservoir and the critical formation pressure of the gas well’s self-injection, the cumulative gas production of the gas well at different tubing depths was analyzed. Taking 11210-1-well as an example, it was believed that when the tubing depth reached 4000 m, the self-injection production time could be extended by 206 days, and the cumulative gas production increased by 5.1 × 106 m3, compared with the tubing depth of 2983 m. The gas production is increased by approximately 12.2 × 106 cubic meters when the tubing depth is 2000 m. The research conclusion can provide theoretical guidance for the optimization of tubing depth during the drainage and production process of shale gas downward-inclined horizontal Wells.
Yang et al. (Sun,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: