WP2 is based mainly on mature data delivery services (related to the Geo‑INQUIRE WP2 Installations), each of them well organised at a European level (see also Section 2). Most services are already integrated into RIs. The main effort of WP2 is therefore focussed on integration of new data sets and types, FAIRification of existing and new data, and additional data service enhancement. This deliverable is a first assessment of the KPI portfolio presented in D2.2, the actual KPIs used by WP2 are listed in Appendix 6. The main challenge to deliver the KPIs is the collection of information across all of the installations. The level of maturity of the WP2 services is demonstrated by the very high response level (see, for example, Table 2). The deliverable shortly presents Coordination activities (Section 2), while the main part of the deliverable is dedicated to the KPI uptake, usage and monitoring (Section 3).
Bruyninx et al. (Mon,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: