All land within the boundaries of the Site was subjected to archaeological monitoring. All work was carried out in accordance with the Health and Safety at Work Act 1974 and the Management of Health and Safety Regulations 1992. Health and Safety considerations were of paramount importance in conducting all fieldwork. Safe working practises overrode archaeological considerations at all times. This document is a report on an a rchaeological w atching b rief undertaken during ground disturbance works necessary for the construction of a single domestic dwelling at Captain's Walk, Brecon . APAC. Ltd was contracted by the client to undertake the watching brief following a Written Scheme of Investigation in re sponse to a planning condition imposed by Brecon Beacons National Park Authority . The watching brief revealed the existing standing walls encompassing the site extended deeper than originally thought and contain features suggesting they were potentially part of a more elaborate structure. The internal area of the development site contained stratified dumps of redeposited natural. N o archaeological resources were encountered . Mae'r ddogfen hon yn adroddiad ar orchwyl gwylio archeolegol a wnaed yn ystod gwaith torri tir oedd yn angenrheidiol ar gyfer adeiladu un tw annedd yn Rhodfa'r Capten, Aberhonddu. Contractiwyd APAC Cyf. gan y cleient i gyflawni'r gorchwyl gwylio yn unol â Chynllun Archwilio Ysgrifenedig (CAY) fel ymateb i amod cynllunio a osodwyd gan Awdurdod Parc Cenedlaethol Bannau Brycheiniog. Datgelodd y gorchwyl gwylio fod y muriau presennol sy'n amgylchynu'r safle yn ymestyn yn ddyfnach nag a feddyliwyd a'u bod hefyd yn cynnwys nodweddion sydd yn awgrymu iddynt unwaith ffurfio rhan o strwythur mwy cymhleth. Cynhwysodd rhan fewnol safle'r datblygiad domennydd haenedig o bridd naturiol ailosodedig. Ni ddaethpwyd o hyd i unrhyw adnoddau archeolegol.
S Reames (Wed,) studied this question.