Abstract #111 submitted to IAEA PLiM 6, Tokyo, 7-11 December 2026. LESE-NuclearQA applies the Wᵢj structural coherence framework to nuclear plant life management. Wₘin is compared against W = e⁻¹ = 0. 36788, derived analytically and not calibrated on plant data. Retrospective validation on Davis-Besse (2002): Wₘin crossed W* approximately 8 months before RPV head cavity discovery. Independent validation on Crystal River 3 (2009) and San Onofre 2&3 (2012): same result, same unmodified mapping. Combined: N=4 RED events, TPR=100%. Deployment workflow integrates into existing QA processes in less than one hour per month. Implications for SMR operational readiness discussed.
Building similarity graph...
Analyzing shared references across papers
Loading...
Galliano Brigo
Accenture (Italy)
Building similarity graph...
Analyzing shared references across papers
Loading...
Galliano Brigo (Wed,) studied this question.
synapsesocial.com/papers/69f4443a967e944ac55674db — DOI: https://doi.org/10.5281/zenodo.19877987
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: