This document summarizes the testing activities carried out on the submarine interconnections acquired through GARR Tender 2301 (i.e., GARR-026 in the GEA platform), aimed at connecting Sardinia to the GARR-T network on the Italian mainland. All testing was performed in compliance with the mandatory requirements outlined in the tender documentation and according to the technical specifications provided by the supplier.
Bolletta et al. (Wed,) studied this question.