A coordinated optimization method for emergency repair scheduling and system operation restoration is proposed to address large-scale transmission line outages caused by extreme weather events such as ice and snow disasters. First, an active outage scenario for transmission lines is constructed based on the Jones icing thickness model and an exponential failure probability model, while incorporating the spatial distribution characteristics of ice disasters. Subsequently, a bi-level optimization model with repair resource constraints is developed. The upper-level model determines the transmission line repair schedule with the objective of minimizing the total repair time while taking system power supply restoration efficiency into account. Based on the completion times of line repairs, the lower-level model optimizes the system restoration process by considering power flow constraints, generator start-up processes, and load restoration characteristics. To address the challenges posed by discrete operational states and strongly coupled bi-level constraints that are difficult to solve using conventional approaches, a logic-based Integer L-shaped coordinated solution method is proposed. Finally, the effectiveness of the proposed method is validated through case studies based on the IEEE New England 10-unit 39-bus system. The results demonstrate that the proposed method can significantly improve system load restoration levels while maintaining high repair efficiency.
Yang et al. (Mon,) studied this question.