Fitness for Service Studies for Rigid Spool Tie-Ins

View Full Paper
XDXuexin DaiMTM. Faizal Chenoth T.NHNicolas Henry

Key Points

  • Both tie-in spool case studies satisfy design criteria, ensuring operational safety and performance.
  • The first case study featured a 300mm gap in a spool tie-in at 140m water depth, assessed using finite element analysis.
  • Advanced automation tools were employed to validate the design and the installation method for the spools.
  • Insights and lessons learned aim to improve future practices in tie-in spool projects involving pipelines.

Abstract

Abstract This paper presents Fitness-For-Service (FFS) studies from projects in which large as-laid gaps existed between flanges of pipeline and tie-in spool. The reasons for the large as-laid gaps are explained. The first case study is for a spool tie-in with water depth of about 140m. Incongruity of duration between operation turnaround and spool fabrication implied the need to perform the metrology in pipeline’s operating while tie-in in shutdown. A gap of 300mm was estimated and was considered in the finite element analysis (FEA) of the tie-in. The gap included margins for fabrication and metrology misalignments and pipeline contraction due to shutdown of the existing pipeline. An element removal and addition technique was used to simulate the initial gap and tie-in operation. The second case study is for a spool tie-in with water depth of about 50m. A gap of about 2.6m between the flanges of the pipeline and tie-in spool was found. Air bags were used to facilitate the tie-in. An automation tool was used to rebuild the surveyed spool shape after tie-in and the locked-in stress level was checked. Then all the functional loads were added to check the spool’s integrity. For both case studies, the spools’ integrities satisfied all the design criteria. This paper provides an insight into the analysis of spool tie-ins and considerable engineering reference significance. The work uses advanced automation tools to validate the design and installation methods. Lessons learned are also presented for future spool tie-in projects.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Dai et al. (2025) studied this question.

synapsesocial.com/papers/68af50acad7bf08b1ead93eahttps://doi.org/10.1115/omae2025-155520
Ask AI
Helpful
Bookmark
Share
View Full Paper