September 5, 2025Journal of Civil Engineering and Architecture0 citationsOpen Access

Integrating Green Building Index Consultancy with Residential Building Design

View Full Paper
LMLesley MetibogunVictoria University of Wellington

Key Points

  • Integration of green building index consultancy enhances cost efficiency in residential projects, yet barriers persist.
  • Limited communication between design teams and GBI consultants restricts collaboration, affecting project success.
  • Semistructured interviews with 30 participants highlighted a lack of insight into consultancy impacts on design timelines.
  • Effective coordination among all stakeholders is essential for successful integration of GBI consultancy into design processes.

Abstract

Despite government incentives, developers are reluctant to invest in green building initiatives due to their perceived extra costs – in particular additional consultant and construction implementation costs. This paper examines the issues preventing the integration of Green Building Index (GBI) consultancy with residential building development in the Malaysian construction industry. Following a literature review of the challenges involving GBI consultancy at the early stage of green residential development, a semistructured interview method was used to elicit opinion on perceived barriers to integrating the GBI process from 30 interviewees; mainly developers, GBI consultants, building consultants and regulators in the Malaysian construction industry with involvement in green building. The study found that a lack of communication between design team members and GBI consultants was a major barrier. This reduced the opportunity for a more collaborative effort to minimise costs and wastage during the design stages. Lack of insight into the impact of integrating the GBI consultancy into design process within the project time frames was evident. Effective coordination is necessary if the involvement of GBI consultants, particularly at early design stage, is to be successfully managed. It is recommended that work coordination among design team members and GBI consultants needs periodic review.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Lesley Metibogun (2025) studied this question.

synapsesocial.com/papers/68bb4dfb6d6d5674bcd026a4https://doi.org/10.17265/1934-7359/2025.08.005