Client-Oriented Highway Construction Cost Estimation Models Using Machine Learning

View Full Paper
FAFani AntoniouKKKonstantinos Konstantinidis

Key Points

  • The study shows that the MLR model outperformed complex alternatives in cost estimation for highway construction projects.
  • Results demonstrated MLR's consistency across six independent variables, providing precise estimates for project costs.
  • Multiple machine learning methods were compared, including artificial neural networks and random forests, for best outcomes.
  • The model enhances decision-making for public authorities, enabling better project funding and procurement strategies.

Abstract

Accurate cost estimation during the conceptual and feasibility phase of highway projects is essential for informed decision making by public contracting authorities. Existing approaches often rely on pavement cross-section descriptors, general project classifications, or quantity estimates of major work categories that are not reliably available at the early planning stage, while focusing on one or more key asset categories such as roadworks, bridges or tunnels. This study makes a novel contribution to both scientific literature and practice by proposing the first early-stage highway construction cost estimation model that explicitly incorporates roadworks, interchanges, tunnels and bridges, using only readily available or easily derived geometric characteristics. A comprehensive and practical approach was adopted by developing and comparing models across multiple machine learning (ML) methods, including Multilayer Perceptron-Artificial Neural Network (MLP-ANN), Radial Basis Function-Artificial Neural Network (RBF-ANN), Multiple Linear Regression (MLR), Random Forests (RF), Support Vector Regression (SVR), XGBoost Technique, and K-Nearest Neighbors (KNN). Results demonstrate that the MLR model based on six independent variables—mainline length, service road length, number of interchanges, total area of structures, tunnel length, and number of culverts—consistently outperformed more complex alternatives. The full MLR model, including its coefficients and standardized parameters, is provided, enabling direct replication and immediate use by contracting authorities, hence supporting more informed decisions on project funding and procurement.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Antoniou et al. (2025) studied this question.

synapsesocial.com/papers/68d4724f31b076d99fa6ade0https://doi.org/10.3390/app151810237
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Optimizing Road Infrastructure Financing through Machine Learning-Driven Cost Forecasting Models: Evidence from Indian Highway Projects.2025
  2. 2Machine learning-based highway tunnel engineering cost prediction and dynamic optimization method2026
  3. 3Evaluating the use of machine learning for road maintenance cost estimation2026
  4. 4Estimating Road Construction Costs with Explainable Machine Learning2024 · 3 citations
  5. 5A Machine Learning-Driven Framework for Sector-Specific Construction Cost Overrun Prediction and Mitigation2026