PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
October 4, 2024EPRA International Journal of Research & Development (IJRD)0 citationsOpen Access

Modelling of the Operating Period of a Compressor Unit on a Ship From the Seismic Industry Ii Part

View Full Paper
IBI BakalovКПКонстантин Петров

Key Points

Key points are not available for this paper at this time.

Abstract

A possibility of extending the time between overhauls period of a compressor unit on a ship from the Seismic Industry by using pre-synthesized predictive mathematical models is considered. These mathematical models were created by processing experimental data and refer to cases of before and after overhaul of the Seismic compressor. In the second part, results from the synthesis of predictive mathematical models of the three piston stages of the Seismic compressor are proposed. KEYWORDS: Offshore Oil Industry, Seismic Vessel, Seismic Air Compressor, Synthesizing Predictive Mathematical Model, Least Squares Method, Regression Analysis

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Bakalov et al. (2024) studied this question.

synapsesocial.com/papers/68e55da2e2b3180350efa902https://doi.org/10.36713/epra18587
Ask AI
Helpful
Bookmark
Share
View Full Paper