PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
June 11, 2024Energies3 citationsOpen Access

Optimizing Mixed-Model Synchronous Assembly Lines with Bipartite Sequence-Dependent Setup Times in Advanced Manufacturing

View Full Paper
AVAsieh VaryaniMSMohsen SalehiMGMeysam Heydari Gharahcheshmeh

Key Points

Key points are not available for this paper at this time.

Abstract

In advanced manufacturing, optimizing mixed-model synchronous assembly lines (MMALs) is crucial for enhancing productivity and adhering to sustainability principles, particularly in terms of energy consumption and energy-efficient sequencing. This paper introduces a novel approach by categorizing sequence-dependent setup times into bipartite categories: workpiece-independent and workpiece-dependent. This strategic division streamlines assembly processes, reduces idle times, and decreases energy consumption through more efficient machine usage. A new mathematical model is proposed to minimize the intervals at which workpieces are launched on an MMAL, aiming to reduce operational downtime that typically leads to excessive energy use. Given the Non-deterministic Polynomial-time hard (NP-hard) nature of this problem, a genetic algorithm (GA) is developed to efficiently find solutions, with performance compared against the traditional branch and bound technique (B&B). This method enhances the responsiveness of MMALs to variable production demands and contributes to energy conservation by optimizing the sequence of operations to align with energy-saving objectives. Computational experiments conducted on small and large-sized problems demonstrate that the proposed GA outperforms the conventional B&B method regarding solution quality, diversity level, and computational time, leading to energy reductions and enhanced cost-effectiveness in manufacturing settings.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Varyani et al. (2024) studied this question.

synapsesocial.com/papers/68e65431b6db6435875e321bhttps://doi.org/10.3390/en17122865
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1The significance of reducing setup times/setup costs2006 · 246 citations
  2. 2JIT sequencing for mixed-model assembly lines with setups using Tabu Search1998 · 89 citations
  3. 3Setup Time Reduction of an Automotive Parts Assembly Line Using Lean Tools and Quality Tools2023 · 10 citations
  4. 4Scheduling a flowline manufacturing cell with sequence dependent family setup times2000 · 148 citations
  5. 5Sequencing to Minimize Work Overload in Assembly Lines with Product Options1991 · 222 citations