PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
April 12, 2024Nigerian Journal of Technology0 citationsOpen Access

Evaluation of the challenges facing small and medium-scale building contractors in Nigeria

View Full Paper
DMDavid Ngwoke MbazorCAClinton AigbavboaWTWellington Didibhuku Thwala

Key Points

Key points are not available for this paper at this time.

Abstract

In this study, the challenges associated with the operations of small and mediumscale building contractors in Nigeria were considered. Globally, the construction industry is faced with several notable challenges in terms of technological advancement, development of operational processes and mechanisms, and keeping up to date with the prevailing business trends. The main objective of this study is to examine the problems that are facing small and medium-scale building contractors in Nigeria. The study employed a questionnaire survey as a data collection instrument. A total of 317 closed-ended questionnaires were administered to small and medium-sized contractors in Akure Nigeria. However, only one hundred and seventy-two (172) returned questionnaires were found valid for analysis. The data was analyzed using the simple descriptive statistical method of percentage and weighted mean score (WMS). Findings revealed that inadequate startup capital for contractors was the major problem facing small and medium-scale building contractors in the study area given its highest mean score of 4.0697. In light of the above, the study recommends that the government being the major player in the building industry should endeavour to initiate, create, and implement policies such as grants and aids for small and medium-sized contractors to enable them to remain in business no matter the state of the economy. It is concluded that the ineffectiveness of the small and medium-sized contractors in the study area is influenced by the un-availability of startup capital, lack of political will in implementing policies that assist small and medium-sized contractors, delayed payment, high-interest rates on loan facilities, and difficulty in getting guarantors for the loan facility.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Mbazor et al. (2024) studied this question.

synapsesocial.com/papers/68e6f722b6db643587671eafhttps://doi.org/10.4314/njt.v43i1.4
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1CHALLENGES FACING CONTRACTORS IN THE EXECUTION OF PUBLIC BUILDING PROJECTS AND THEIR IMPACT ON PERFORMANCE2019 · 7 citations
  2. 2The expansion of employment opportunities in the building construction sector in the context of structural adjustment: some evidence from Kenya and Tanzania2002 · 32 citations
  3. 3Local Content Policy and SMEs Sector Promotion: The Nigerian Oil Industry Experience2010 · 43 citations
  4. 4Industry 4.0 deployment in the construction industry: a bibliometric literature review and UK-based case study2020 · 311 citations
  5. 5Algorithm for Scheduling with Multiskilled Constrained Resources2000 · 75 citations