PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
October 9, 2025EPJ Web of Conferences0 citationsOpen Access

A Proposal for Integrating IPbus ALFRED into the ALICE- FIT setup

View Full Paper
KRK. Rosłon

Key Points

  • Integrating ALFRED software into the ALICE FIT setup aims to enhance data communication and trigger performance.
  • The upcoming update in March 2025 will redefine the communication between Front-End Electronics and Detector Control System.
  • This framework extends the Front-End Device system, allowing compatibility with bespoke electronics utilizing IPbus.
  • The proposed system supports all detectors that require the IPbus communication standard, ensuring flexibility and scalability.

Abstract

The official data collection for the Run 3 of the Large Hadron Collider (LHC) at CERN in Geneva commenced on July 5, 2022, following approximately three and a half years of maintenance, upgrades, and commissioning. Among the many upgrades to ALICE (A Large Ion Collider Experiment) is the new Fast Interaction Trigger (FIT) detector. Constant improvements to FIT’s hardware, firmware, and software will enable progressively better performance. Between November 2024 and March 2025, during the year-end technical stop, an update to the communication path between the Front-End Electronics (FEE) and the Detector Control System (DCS) is planned. This update will introduce a new approach based on the ALFRED (ALICE Low-Level Front-End Device) software, supported by the central DCS ALICE system. To address the challenge of integrating custom electronics with distributed control systems, this paper describes a novel extension of the Front-End Device (FRED) framework, which can interface bespoke electronics with standard SCADA (Supervisory Control and Data Acquisition) systems using IPbus. This framework can be applied to all detectors utilizing IPbus communication.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

K. Rosłon (2025) studied this question.

synapsesocial.com/papers/68e70db290569dd607ee6404https://doi.org/10.1051/epjconf/202533701328
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1A Proposal for Integrating IPbus ALFRED into the ALICE- FIT setup2025
  2. 2ALICE Fast Interaction trigger Detector Control System for the LHC RUN 32025
  3. 3Commissioning and Performance of the New ALICE Inner Tracking System in the First Phase of LHC Run 32024 · 2 citations
  4. 4ALICE 3: A next-generation heavy-ion detector for LHC Run 52026
  5. 5Technical Design Report for the Upgrade of the ALICE Inner Tracking System2014