Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana

View Full Paper
FNFrancis NuakoFGFrank Ato GhansahTAThomas Adusei

Key Points

Key points are not available for this paper at this time.

Abstract

Purpose It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?” Design/methodology/approach This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data. Findings This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana. Practical implications When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment. Originality/value The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Nuako et al. (2024) studied this question.

synapsesocial.com/papers/68e73082b6db6435876a993chttps://doi.org/10.1108/ci-07-2022-0176
Ask AI
Helpful
Bookmark
Share
View Full Paper