December 21, 2025International Journal of Research in Engineering Science and Management0 citations

Simulation Driven Decision Framework for Heat Exchanger Retrofits: A Case Study of a Multi Pass Naphtha Cooler

View Full Paper
NENoble Aggrey EfemenaPMPeter MuwarureOOObumneme Onyeka Okwonna

Key Points

  • To present a decision framework for retrofitting heat exchangers in petrochemical plants using simulation and economic analysis.
  • Developed a modular decision framework integrating process simulation and lifecycle economics.
  • Modeled a multi pass shell and tube cooler in Aspen HYSYS for optimization.
  • Analyzed fouling uncertainty with Monte Carlo simulations to quantify economic sensitivity.
  • Optimized retrofit increased heat duty from 2,205 kW to 3,150 kW (+42.7%).
  • Total annual cost decreased by 10.2% to $115,000/year despite a 6.8% increase in capital expenditure.
  • Fouling uncertainty produced a total annual cost sensitivity of ≈4.8%, affecting payback by ±0.3 years.

Abstract

A modular decision framework that integrates process simulation, fouling uncertainty quantification, and lifecycle economics is presented for prioritizing heat exchanger retrofits in petrochemical plants. A multi pass shell and tube cooler used to cool a C₆–C₁₂ naphtha stream was modelled in Aspen HYSYS Exchanger Design and Rating and optimized over tube count, baffle spacing, and cooling water flow to minimize total annual cost subject to hydraulic and mechanical constraints. Fouling was modelled with a combined resistance and a Monte Carlo ±5% sampling quantified economic sensitivity. The optimized retrofit (220 tubes, 0. 45 m baffle spacing, 28, 000 kg·hr⁻¹ cooling water) increased heat duty from 2, 205 kW to 3, 150 kW (+42. 7%), raised LMTD from 42. 3 °C to 58. 1 °C (+37. 4%), and reduced shell and tube side pressure drops to 0. 70 bar and 1. 00 bar, respectively. Despite a 6. 8% CapEx increase, TAC fell by 10. 2% to 115, 000/yr, yielding a 2. 1 year payback under base economic assumptions. Fouling uncertainty produced a TAC sensitivity of ≈4. 8%, shifting payback by ±0. 3 years. The framework is transferable across plant exchanger inventories and supports data driven retrofit prioritization.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Efemena et al. (2025) studied this question.

synapsesocial.com/papers/69473b64db9c958d0dfca74chttps://doi.org/10.65138/ijresm.v8i11.3378