January 22, 2026JACOW0 citationsOpen Access

The SPS beam loss monitoring system renovation plan

View Full Paper
EGEva Calvo GiraldoBSBelen SalvachuaCZChristos Zamantzas

Key Points

  • The renovation aims to modernize the SPS beam loss monitoring system for improved detection and reliability.
  • Upgrading 286 ionisation chambers and 144 detectors along extraction lines
  • Modernizing cabling and acquisition electronics during Long Shutdown 3
  • Adopting a design similar to the LHC BLM system with separated front-end and back-end electronics
  • Expected enhancements in performance and modularity of the beam loss monitoring system
  • Improvement in system reliability to support upcoming LHC upgrades

Abstract

The Super Proton Synchrotron (SPS) beam loss monitoring (BLM) system at CERN, operational for several decades, currently comprises 286 Ionisation Chambers (ICs) around the SPS ring and approximately 144 additional detectors along various extraction lines (TT20, TT40, TT60, etc.). A complete renovation of the system is planned during Long Shutdown 3 (LS3), encompassing detectors, cabling, and acquisition electronics. The upgraded architecture will adopt a design similar to the current LHC BLM system—featuring front-end and back-end electronics housed in separate crates and connected via optical links—ensuring compatibility with the LHC upgrade scheduled around LS4. This paper presents an overview of the proposed architecture for the SPS ring and transfer lines, detailing the key components and expected improvements in performance, modularity and reliability.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Giraldo et al. (2026) studied this question.

synapsesocial.com/papers/6971be50642b1836717e2eb8https://doi.org/10.18429/jacow-ibic2025-mopco07
Ask AI
Helpful
Bookmark
Share
View Full Paper