Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

View Full Paper
YLYong Joong LeeJGJustin GriswoldSKSang-Ho Kim

Key Points

  • This research aims to present a design for a new radioisotope production target utilizing reserve beam power at the Spallation Neutron Source.
  • Developed a design for a target utilizing thorium discs and steel encapsulation.
  • Calculated post-irradiation radioactivity of Ac-225 and Ra-225.
  • Conducted thermal and structural analyses based on nuclear heating data.
  • Evaluated technical feasibility for a 250-kW beam load.
  • Estimated activity levels of Ac-225 and Ra-225 indicate significant potential for medical applications.
  • Thermal and structural analyses confirm feasibility under high power load conditions.
  • Target design supports extremely low duty factor, enhancing reliability.

Abstract

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2. 7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of 3. 5 × 10^-6 is presented from thermal, structural and fatigue lifetime perspectives.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Lee et al. (2026) studied this question.

synapsesocial.com/papers/6980fc73c1c9540dea80e443https://doi.org/10.18429/jacow-napac2025-thp066
Ask AI
Helpful
Bookmark
Share
View Full Paper