February 8, 2026Journal of Financial Management of Property and Construction0 citations

Evaluating internal risks of slow disbursement in Vietnam’s state-funded construction projects: a fuzzy multi-criteria approach

View Full Paper
HKHà Duy Khánh

Key Points

  • The aim is to identify risks that contribute to delays in disbursement for state-funded construction projects in Vietnam.
  • Integrated literature review and expert surveys
  • Identification of 17 risk factors categorized into human-related, policy-related, and performance-related
  • Data collection via structured questionnaire and analysis using various statistical methods including Cronbach's alpha and Spearman’s rank correlation
  • Limited authority of investors is identified as a major risk factor
  • Frequent legal policy changes and delays in site clearance are significant contributors to slow disbursement
  • Human-related risks have the greatest influence on disbursement delays, with consistent assessments among similar experience levels

Abstract

Purpose In Vietnam, delays in disbursement for state-funded construction projects remain a persistent challenge, directly impacting stakeholder performance. This study aims to identify significant risks contributing to these delays and proposes a multi-criteria model to mitigate them. Design/methodology/approach Adopting a hybrid method that integrates literature review and expert surveys, the study identifies 17 risk factors grouped into three categories: human-related, policy-related and performance-related. Data was collected through a structured questionnaire and analyzed using Cronbach’s alpha, mean score analysis, Spearman’s rank correlation, Exploratory Factor Analysis and Fuzzy Synthetic Evaluation (FSE). Findings The analysis highlights the limited authority of investors, frequent legal policy changes and delays in site clearance as the most critical causes of slow disbursement. Human-related risks were found to have the greatest influence on this disbursement. Respondents with similar work experience shared consistent assessments, while those in different roles or positions showed divergent views. The FSE results confirm that these risks significantly hamper the disbursement process in public construction projects. Research limitations/implications Evaluating disbursement delays and developing a corresponding model are essential for future research on enhancing project performance. Nevertheless, further in-depth study is needed to understand the full impact of these delays. Practical implications Stakeholders should prioritize improving the qualifications and authority of staff and managers involved in the disbursement process. Doing so will accelerate payment procedures and contribute to more stable cash flow for all parties, especially contractors. Originality/value The study’s findings provide valuable insights for stakeholders, particularly contractors, to manage financial planning better in the face of disbursement delays.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Hà Duy Khánh (2026) studied this question.

synapsesocial.com/papers/698828990fc35cd7a884835ahttps://doi.org/10.1108/jfmpc-10-2024-0077
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach2015 · 267 citations
  2. 2Investigating Factors Causing Delay In The Implementation Of Urban Development Projects In The Slums Of Sari City2018 · 3 citations
  3. 3Modelling the Implications of Delayed Payments on Contractors’ Cashflows on Infrastructure Projects2023 · 38 citations
  4. 4Organizational culture of the Croatian construction industry2016 · 35 citations
  5. 5Overruns in transportation infrastructure projects2012 · 105 citations