February 8, 2026Journal of Quality in Maintenance Engineering0 citations

Condition maintenance and prediction system in an injection molding machine: a case study

View Full Paper
DRDaniel RebeloJMJoaquim MoreiraFTFarinha José Torres

Key Points

  • The research aims to reduce unplanned stoppages and enhance operational efficiency of injection molding machines through advanced maintenance strategies.
  • Developed a predictive and condition-based maintenance integration model.
  • Used continuous monitoring of electrical signals and vibrations.
  • Processed real-time data with a Python script for maintenance management software integration.
  • Employed action research methodology for real-world development and implementation.
  • MTBF increased by 97.36% in August and later by 20% in December.
  • MTTR increased by 313.31% in August and later by 84% in December.
  • Downtime reduced by 65.04% in August and by 79% in December.

Abstract

Purpose In an increasingly competitive market, equipment availability is a strategic variable for the competitiveness and success of companies. The objective of the research in this article is to present contributions to reduce unplanned production stoppages and optimise the operational efficiency of an injection moulding machine. This will be achieved by developing a systematic strategy to integrate predictive and condition-based maintenance systems with maintenance management software. Design/methodology/approach The model developed is based on the continuous monitoring of electrical signals and vibrations, with the processing of data collected in real time through a script developed in Python. This integrates the information into the maintenance management software, facilitating a quick and accurate response to component wear conditions. The methodology employed was action research, as it was a case study developed in a real context, with active participation in development and implementation, with the aim of continuous improvement. Findings In August, a substantial increase was observed in the primary indicators: The mean time between failures (MTBF) increased by 97.36%, the mean time to repair (MTTR) increased by 313.31%, and the downtime was reduced by 65.04%. In December, although the figures were more moderate, significant improvements were maintained: The MTBF increased by 20%, the MTTR increased by 84%, and the downtime was reduced by 79%. Originality/value The findings of the study indicated that the implementation of a structured approach for the acquisition and monitoring of electrical signals and vibration data was imperative to achieve substantial gains.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Rebelo et al. (2026) studied this question.

synapsesocial.com/papers/698828cb0fc35cd7a8848a27https://doi.org/10.1108/jqme-05-2025-0050
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Machine Learning (ML) Based Repair-Count and Periodic Maintenance Policy for Multipurpose CNC Machinery2025
  2. 2Hybrid predictive maintenance model – study and implementation example2024 · 4 citations
  3. 3Analysis of the State and Fault Detection of a Plastic Injection Machine—A Machine Learning-Based Approach2025
  4. 4Equipment Failure Pattern Analysis and Predictive Maintenance Potential Using FOM-Based Integrated 4M Data2026
  5. 5Prediction maintenance based on vibration analysis and deep learning — A case study of a drying press supported on a Hidden Markov Model2024 · 9 citations