February 11, 2026Sustainability0 citationsOpen Access

Dynamic Failure Analysis of Suction Anchor Installation Operation in Marine Natural Gas Hydrate Development Using DBN-GO Method

KLKang LiuHZHaojun ZhangXXX. Xu

Key Points

  • The study aims to analyze the failure probabilities in suction anchor installation during natural gas hydrate development.
  • Developed a Goal-Oriented model analyzing human and equipment factors.
  • Established a Bayesian Network analysis model mapping key nodes.
  • Applied Cognitive Reliability and Error Analysis Method and Dempster-Shafer theory for failure probabilities.
  • Conducted dynamic risk assessment considering equipment transition probabilities.
  • Failure probability of suction anchor installation is 0.298%, indicating low risk.
  • Suction pump pressure control identified as the most critical factor affecting human errors.
  • Reliability of suction pump and ROV are the main equipment factors.
  • Risk increases gradually over time, emphasizing the need for maintenance strategies.

Abstract

Suction anchors play an important role in the exploration and development of marine natural gas hydrate (NGH). Suction anchors increase the bearing capacity and reduce tilting or sinking risk of underwater wellheads in the exploration and development process. This study proposes a dynamic failure analysis procedure for suction anchor installation based on the DBN-GO method. Firstly, a Goal-Oriented (GO) model is established by analyzing the human and equipment factor nodes in the suction anchor installation operation process. A Bayesian Network (BN) analysis model is set up by mapping the key nodes in the GO model. Then, the Cognitive Reliability and Error Analysis Method (CREAM) and the Dempster–Shafer (D-S) evidence theory are used to quantify the failure probabilities of human and equipment factor nodes in the BN model. The main risk factors are identified using Bayesian backward inference. Finally, the dynamic risk assessment of the suction anchor installation operation is conducted, considering the equipment node transition probability of the BN. Tkae the second production test of natural gas hydrates in the South China Sea as a case study. The study result shows that the failure probability of the suction anchor installation operation is 0.298%, which is at a low-risk level. Suction pump pressure control is the most critical factor leading to human errors. Among the equipment factor, the reliability of the suction pump and the ROV is the most important. Dynamic Bayesian inference shows the risk gradually increases with time. A reasonable maintenance strategy is conducive to reducing the accumulated risks caused by the time-varying degradation of equipment performance. The results could provide significant support in risk management and decision-making for the suction anchor installation operation, which will further promote the environmental sustainability, operational safety and economic feasibility of marine natural gas hydrate development.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Liu et al. (2026) studied this question.

synapsesocial.com/papers/698c1d1d267fb587c655fa60https://doi.org/10.3390/su18041769