Proactive Maintenance Plan for Kuthiran Tunnel Using Primavera P6

MPMuhsina. P.DBDr. D. bhuvaneswariMAMs. S. Abitha

Key Points

  • The aim is to establish a proactive maintenance strategy for the Kuthiran Tunnel to improve safety and efficiency.
  • Developed a Proactive Maintenance Plan using Primavera P6.
  • Integrated condition-based monitoring and predictive maintenance triggers.
  • Scheduled activities with risk-aware sequencing and optimized resource allocation.
  • Considered environmental impact and safety compliance milestones.
  • Demonstrated a dynamic maintenance schedule adaptable to real-time data.
  • Reduced unplanned downtime and extended tunnel lifespan.
  • Optimized maintenance budgets by improving resource allocation.

Abstract

The Kuthiran Tunnel, a critical infrastructure component in the challenging terrain of Kerala, India, requires a systematic and proactive maintenance strategy to ensure its structural integrity, operational safety, and long-term functionality. Traditional reactive maintenance approaches are often inadequate for such complex, high-traffic, and environmentally sensitive structures, leading to unexpected failures, prolonged closures, and increased life-cycle costs. This paper proposes a Proactive Maintenance Plan (PMP) developed and scheduled using Primavera P6, a leading enterprise project management software. The plan integrates condition-based monitoring, predictive maintenance triggers, resource-level scheduling, and risk-aware activity sequencing to transition from corrective to preventive and predictive maintenance paradigms. Key components include structural health monitoring (SHM) integration, environmental impact considerations, safety compliance milestones, and optimized resource allocation for labour, materials, and equipment. The study demonstrates how Primavera P6 can be utilized to create a dynamic, adaptable, and visually coherent maintenance schedule that accounts for real-time data inputs, seasonal constraints, traffic management requirements, and regulatory inspections. The proposed framework aims to reduce unplanned downtime, extend tunnel lifespan, enhance safety, and optimize maintenance budgets. This research contributes to the field of infrastructure asset management by providing a replicable digital model for large-scale tunnel maintenance in hilly and eco-sensitive regions.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

P. et al. (2026) studied this question.

synapsesocial.com/papers/698ebf5085a1ff6a93016a96https://doi.org/10.5281/zenodo.18604449
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Towards smart maintenance for operational tunnels: from digital reconstruction to predictive analysis2026
  2. 2Construction & Management of Underground Structure with Scheduling & Estimation.2024
  3. 3Development of Maintenance Management Model to Enhance Availability Performance of Railway Tunnels: A Case Study of Tazara2025
  4. 4Cost Overrun and Delays in Construction Management by Using Primavera2024
  5. 5Integrating building information modeling and Primavera P6 to mitigate delays and optimize costs in public housing projects in India2026