Methodological Evaluation and Panel-Data Estimation of Power-Distribution System Yield in Ethiopia, 2000–2026

View Full Paper
MBMeklit Bekele

Key Points

  • The aim is to evaluate the methodological soundness of power-distribution yield assessments and identify determinants for improvement.
  • Developed a balanced panel dataset of operational districts in Ethiopia.
  • Applied a fixed-effects econometric model for yield estimation.
  • Clustered robust standard errors at the district level to address serial correlation.
  • Identified systematic over-reporting in historical yield data.
  • Infrastructure renewal contributes to about 40% of yield improvement with a significant coefficient of 0.15.
  • Operational practices and load density also emerged as significant positive determinants.

Abstract

The operational yield of power-distribution systems in developing economies is often constrained by ageing infrastructure and methodological inconsistencies in performance evaluation, leading to significant technical and commercial losses. This study aims to develop and apply a robust panel-data econometric framework to evaluate the methodological soundness of yield assessments and to estimate the determinants of system yield improvement for a national power utility. A balanced panel dataset of operational districts was constructed. The core specification is a fixed-effects model: Y₈ₓ = ᵢ + ₁ X₁, ₈ₓ +. . . + ₖ X₊, ₈ₓ + ₈ₓ, where Y₈ₓ is the distribution yield. Robust standard errors were clustered at the district level to account for serial correlation. The methodological evaluation revealed systematic over-reporting in historical yield data. Estimation indicates that targeted infrastructure renewal explains approximately 40% of the observed yield improvement, with a coefficient of 0. 15 (95% CI: 0. 11, 0. 19). Operational practices and load density were also significant positive determinants. The proposed panel-data methodology provides a more reliable framework for yield estimation than prior aggregate approaches. The findings confirm that strategic capital investment in distribution assets is a primary driver for reducing losses. Utilities should adopt panel-data methodologies for internal performance auditing. Investment planning should prioritise the replacement of obsolete feeder lines and substation components, informed by the empirical elasticities estimated. distribution losses, fixed-effects model, infrastructure investment, panel data, power system yield, technical losses This paper provides the first application of a district-level panel model to decompose the drivers of power-distribution yield in the national context, introducing a method to correct for systematic reporting bias in utility data.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Meklit Bekele (2017) studied this question.

synapsesocial.com/papers/69b3ac1d02a1e69014ccd7e1https://doi.org/10.5281/zenodo.18966013
Ask AI
Helpful
Bookmark
Share
View Full Paper