A Time-Series Forecasting Model for Risk Reduction in Rwanda's Power-Distribution Infrastructure: A Policy Analysis, 2000–2026

View Full Paper
JUJean de Dieu UwimanaMUMarie Chantal UwaseJNJean-Pierre Niyonzima

Key Points

  • The aim is to evaluate a forecasting model to assess risk reduction in Rwanda's power-distribution network.
  • Developed a time-series forecasting model using historical failure data and load growth projections.
  • Utilized an ARIMAX statistical approach linking engineering variables to risk assessments.
  • Estimated model parameters through maximum likelihood, ensuring robust statistical inference.
  • The model predicts a 22% reduction in risk of catastrophic failures across the network.
  • Confidence interval for risk reduction ranges from 18% to 26%, confirming statistical significance.
  • The model demonstrates the value of data-driven approaches in infrastructure policy.

Abstract

"background": "Rwanda's power-distribution infrastructure faces significant reliability challenges due to ageing assets and increasing demand. Effective policy for infrastructure investment requires robust, forward-looking risk assessments to prioritise interventions and allocate resources efficiently. ", "purpose and objectives": "This policy analysis evaluates a novel forecasting model designed to quantify risk reduction within the national power-distribution network. The objective is to provide a methodological framework for evidence-based policy planning and capital expenditure prioritisation. ", "methodology": "A time-series forecasting model was developed, integrating historical failure data, maintenance records, and load growth projections. The core statistical model is an ARIMAX formulation: yt = \ + =1^{p\ yt-i + =1^q\ -i + =1^r\ Xt, i + \, where Xt represents exogenous policy and engineering variables. Model parameters were estimated using maximum likelihood, with inference based on heteroskedasticity-robust standard errors. ", "findings": "The analysis projects that a targeted policy of strategic asset replacement, informed by the model, could reduce the aggregate risk of catastrophic failure across the network by approximately 22% over the forecast horizon. The 95% confidence interval for this reduction is between 18% and 26%, indicating a statistically significant effect. ", "conclusion": "The forecasting model provides a technically sound and transparent tool for linking engineering data to infrastructure policy outcomes. It demonstrates that data-driven policy can substantially mitigate systemic risk in power distribution. ", "recommendations": "Policymakers should institutionalise the use of predictive, engineering-based risk models in national infrastructure planning cycles. A dedicated fund for data collection and model updating should be established to ensure long-term efficacy. ", "key words": "infrastructure risk, predictive maintenance, ARIMAX modelling, capital planning, electrical grids", "contribution statement": "

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Uwimana et al. (2006) studied this question.

synapsesocial.com/papers/69b3acd302a1e69014ccee87https://doi.org/10.5281/zenodo.18970615