PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 15, 20260 citationsOpen Access

Time-Series Forecasting for System Reliability Assessment in Ethiopian Manufacturing Plants: A Methodological Evaluation

View Full Paper
BGBedru GobenaAAAbiy AbayolaaYTYared Tadesse

Key Points

  • To assess the reliability of manufacturing systems in Ethiopia using time-series forecasting.
  • Employing a hybrid ARIMA-GARCH model for forecasting
  • Collecting and analyzing historical operational data
  • Feature engineering and model selection based on AIC and BIC
  • Validation through cross-validation techniques
  • The ARIMA-GARCH model achieved over 85% accuracy in predicting system failures
  • Mean absolute error was reported at 2.3%
  • This approach significantly improved reliability assessments compared to previous methods

Abstract

Manufacturing plants in Ethiopia are facing challenges related to system reliability due to varying operational conditions and resource constraints. A hybrid ARIMA-GARCH (AutoRegressive Integrated Moving Average-Generalized Autoregressive Conditional Heteroskedasticity) model was employed to forecast time-series data from Ethiopian manufacturing plants. The methodology involved collecting and analysing historical operational data, feature engineering, model selection based on AIC and BIC criteria, and validation through cross-validation techniques. The ARIMA-GARCH model demonstrated an accuracy of over 85% in predicting system failures within a one-year forecast horizon, with the mean absolute error (MAE) being 2. 3%, indicating a significant improvement in reliability assessment compared to previous methods. This study provides empirical evidence supporting the use of ARIMA-GARCH for time-series forecasting in manufacturing systems, offering a practical tool for enhancing system reliability and operational efficiency in Ethiopian plants. Manufacturing plant managers are encouraged to adopt this methodology for proactive maintenance planning, leading to reduced downtime and increased productivity. Additionally, further research should be conducted to validate the model across different types of manufacturing environments. ARIMA-GARCH, time-series forecasting, system reliability, Ethiopian manufacturing plants The maintenance outcome was modelled as Y₈ₓ=₀+₁X₈ₓ+uᵢ+₈ₓ, with robustness checked using heteroskedasticity-consistent errors.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Gobena et al. (2013) studied this question.

synapsesocial.com/papers/69b606c483145bc643d1cf6chttps://doi.org/10.5281/zenodo.18995924
Ask AI
Helpful
Bookmark
Share
View Full Paper